Rough cleaning: earlier in the build
Rough cleaning addresses accessible areas before the later finish-focused clean. Identify the dust and routine residue to be cleaned, and arrange bulk or heavy debris removal separately.
Post-Construction Cleaning
Rough, progress, final, and touch-up cleaning address different points in a commercial project. Use this guide to distinguish the visits and understand why the same room sometimes needs more than one clean.
Call (844) 531-9893Tell us about your project
Rough cleaning addresses accessible areas before the later finish-focused clean. Identify the dust and routine residue to be cleaned, and arrange bulk or heavy debris removal separately.
Progress cleaning removes dust and routine residue during construction. On a phased project, cleaners work through completed rooms or sections while building work continues elsewhere.
Final cleaning removes construction dust from finished floors, interior windows, fixtures, and restroom surfaces after building work ends. Cleaning methods must suit each material.
An installer returning to a finished room can leave new dust or marks. A touch-up visit addresses the affected surfaces; it is different from repairing defects on a construction punch list.
Pre-opening cleaning prepares the interior before a business starts operating. Turnover cleaning takes place before the space is handed to its next occupant. Both can include floors, interior glass, fixtures, and shared rooms.
Request final cleaning when the main construction work is complete. If work is continuing, progress cleaning can remove dust from completed areas, followed by a final clean or touch-up when the remaining work ends.